Installing Fusion Wideband
Page 158 InterReach Fusion Wideband Installation, Operation, and Reference Manual
© 2015 TE Connectivity D-620616-0-20 Rev K TECP-77-044 Issue 9 March 2015
Using a Base Station to Monitor Fusion Wideband
NOTE: Prior to connecting a Fusion Wideband Main Hub to a BTS, the carrier must configure the BTS for
contact closure monitoring.
When you connect a BTS to Fusion Wideband, the Fusion Wideband Main Hub is the alarm source
(output) and the BTS is the alarm sense (input), as shown in Figure 28. An interface cable is
required between the daisy-chain cable
and the BTS. Because BTS alarm interface pinouts and
Fusion Wideband-to-BTS distances vary, this cable is often custom and wired on-site. Refer to
“Uplink/Downlink Optical-Fiber Ports” on page 33 for Alarm Contact details (Normally Closed).
Figure 28.
Using a BTS to Monitor Fusion Wideband
NOTE: For normally open contacts, the fault and warning contacts need to be wired in parallel with
other Main Hubs.
NOTE: TE does not recommend using normally open contacts.
Band 1 Band 2 Band 3
UL1 UL2 UL3
Alarms
DL1 DL2 DL3
AC Power
Band 1 Band 2 Band 3
UL1 UL2 UL3
Alarms
DL1 DL2 DL3
AC Power
Fusion Main Hub
Alarm
Sense
5-port Alarm Daisy-Chain Cable
Alarm
Source
BTS
Alarm
Source
Interface
Cable
(custom-made, on-site)