User's Manual

Table Of Contents
Configuring the Fusion Wideband System
InterReach Fusion Wideband Installation, Operation, and Reference Manual Page 141
D-620616-0-20 Rev K TECP-77-044 Issue 9 March 2015 © 2015 TE Connectivity
8 Select the Fusion Main Hub and click Install/Configure System. A screen similar to the one
shown below opens.
9 If desired
, type in a Label, which is the system name displayed next to the icons and used in
messages. It can be up to 32 characters long depending upon the firmware version. The
default system label is Fusion, and will be used if you enter nothing.
10 Use the paramete
rs in the Schedule System Test panel to schedule a system test.
CAUTION! Schedule System Test allows periodic, automatic execution of the system end-to-end test. Just
like Perform System Test, a Schedule System Test suspends normal service for the duration of
the test; calls are dropped, and no new calls can be established during the test. Test duration
depends on the configuration (number of RAUs) and requires one or two minutes to complete.
a Select the Enable check box to enable this feature.
b Select the System test on power up che
ck box to cause system test on power up.
c In the Date box,
enter the date the test is to run. Enter the date in the MM/DD/YYYY
format.
d In the Time box, enter the time the syste
m test should run.
e Use the Recurrence Day and Week
radio buttons to select if the system test should rerun
on a daily or weekly schedule, and the corresponding text box to enter the interval
between tests.
After completion of the s
ystem test, the scheduled system test time is updated to the next test
time, and an event log entry is made.