User's Manual

Table Of Contents
Preparing for System Installation
InterReach Fusion Wideband Installation, Operation, and Reference Manual Page 113
D-620616-0-20 Rev K TECP-77-044 Issue 9 March 2015 © 2015 TE Connectivity
Tools and Materials Required
Configuring the System
PC/laptop running
standard browser software
Refer to the AdminBrowser User Manual (PN
D-620607-0-20)
Miscellaneous
Cross-over Ethernet cable Male connectors; Fusion Wideband Main Hub to a PC/laptop running a
standard browser to the Fusion Wideband AdminBrowser software;
local connection or LAN switch connector for remote connections.
Straight-through cable Female/male connectors; Fusion
Wideband Main Hub to a modem for a
remote connection.
Distances
Fusion Wideband Main Hub is within 3–6m
(10–20 ft) of connecting
repeater/BTS/FlexWave
If longer distance, determine the loss of the cable used for this
connection and adjust the RF signal for each Band into the Fusion
Wideband Main Hub accordingly. This can be done by readjusting the
power from the Base Station, or by changing the attenuation value
between the Base Station/repeater and the Hub Bands (1 and 2).
Table 90. Tools and Materials Required for Component Installation
Description
Cable ties
Screwdriver
Mounting screws and spring nuts
Screws, anchors (for mounting
RAUs)
Drill
Fiber connector cleaning kit
Fusion Wideband splicer
Splicing tool kit (including snips, cladding strippers, fiber cleaver,
isopropyl alcohol,
lint-f
ree wipes)
Fusion Wideband splicing sleeves
Table 89. Installation Checklist (Cont.)
Installation Requirement Consideration