User's Manual Part 2
Installing Fusion Wideband
Page 158 InterReach Fusion Wideband Installation, Operation, and Reference Manual
© 2013 TE Connectivity Ltd D-620616-0-20 Rev H • TECP-77-044 Issue 7 • May 2013
UsingaBaseStationtoMonitorFusionWideband
NOTE: TheBTSmustbeconfigured,bythecarrier,forcontactclosuremonitoringpriortoconnectinga
FusionWidebandMainHubtoit.
ǡ
ȋȌȋȌǡͶǤ
ǦǤ
ǦǦǡǦǤ
DzȀdz͵͵ȋȌǤ
Figure47.Using a BTS to Monitor Fusion Wideband
NOTE: For normally open contacts, the fault and warning contacts need to be wired in parallel with
otherMainHubs.
NOTE: TEdoesnotrecommendusingnormallyopencontacts.
Band 1 Band 2 Band 3
UL1 UL2 UL3
Alarms
DL1 DL2 DL3
AC Power
Band 1 Band 2 Band 3
UL1 UL2 UL3
Alarms
DL1 DL2 DL3
AC Power
Fusion Main Hub
Alarm
Sense
5-port Alarm Daisy-Chain Cable
Alarm
Source
BTS
Alarm
Source
Interface
Cable
(custom-made, on-site)