User's Manual Part 1

Installing Fusion Wideband
Page 114 InterReach Fusion Wideband Installation, Operation, and Reference Manual
© 2013 TE Connectivity Ltd D-620616-0-20 Rev H TECP-77-044 Issue 7 May 2013
OptionalAccessories
Table86. OptionalAccessoriesforComponentInstallation
3
Description
Wall-mount bracket (PN 4712)
When using this bracket with an Fusion Wideband Main Hub, the Hub’s mounting bracket must be moved
to the alternate mounting position (refer to “Installing a Fusion Wideband Main Hub in a Rack” on page 115).
Cable management (Cable manager: PN 4759; Tie wrap bar: PN 4757)
Splice trays
Pigtails with SC/APC connectors, 3 m (10 ft.)
Multi-mode fiber SC/APC pigtail: PN 4012SCAPC-10
Single-mode fiber SC/APC pigtail: PN 4013SCAPC-10
Jumper cable when Main and Expansion Hubs are collocated, 3 m (10 ft.)
Multi-mode fiber SC/APC: PN 4018SCAPC-10
Line Sharing Switch:
When using a single POTS line with multiple Fusion Wideband Main Hubs, connect up to four or eight
modems to a line sharing switch:
4-port (240031-0)
8-port (240052-0)
Alarm Cables:
5-port Alarm Daisy-Chain Cable (PN 4024-3)
Alarm Sense Adapter Cable (PN 4025-1)