User's Manual Part 2

Table Of Contents
Preparing for System Installation
InterReach Fusion Wideband Installation, Operation, and Reference Manual Page 111
D-620616-0-20 Rev H • TECP-77-044 Issue 7 May 2013 © 2013 TE Connectivity Ltd.
PREPARINGFORSYSTEMINSTALLATION
PreInstallationInspection
FollowthisprocedurebeforeinstallingFusionWidebandequipment:
1 Ve
rifythenumberofpackagesreceivedagainstthepackinglist.
2 Checkallpackagesforexternaldamage;r
eportanyexternaldamagetotheshippingcarrier.
Ifthereisdamage,ashippingagentshouldbepresentbeforeyouunpackandinspectthe
contentsbecausedamagecausedduringtransitistheresponsibilityoftheshippingagent.
3 Ope
nandcheckeachpackageagainstthepackinglist.Ifanyitemsaremissing,contactTE
customerservice(seeAppendixD:ContactingTEConnectivity”onpage229).
4 Ifdama
geisdiscoveredatthetimeofinstallation,contacttheshippingagent.
InstallationChecklist
Table84. InstallationChecklist
Installation Requirement Consideration
Floor Plans Installation location of equipment clearly marked
System Design Used to verify frequency ba
nds after installation
Power available:
Fusion Wideband Main Hub (AC)
Fusion Wideband Expansion Hub (AC)
To RAU (DC)
Fusion Wideband Main Hub (DC)
Fusion Wideband Expansion Hub (DC)
Hub’s power cord is 2 m (6.5 ft) long.
115/230V, 2/1A, 50–60 Hz
115/230V, 6/3A, 50-60 Hz
54V (from the Hub)
38–64VDC, 2.5A
38–64VDC, 14A
Rack space available
(Main and Expansion Hub)
89 mm (3.5 in.) high (2U)
Wall-Mount Fusion Wideband Main Hub Hub must be mounted on 3/4” plywood backboard.
Clearance for air circulation:
Fusion Wideband Main or Expansion Hub
RAU
76 mm (3 in.) front and rear, 51 mm (2 in.) sides
76 mm (3 in.) all around
Suitable operating environment:
Fusion Wideband Main or Expansion Hub
Indoor location only
0° to +45°C (+32° to +113°F)
5% to 95% non-condensing humidity
RAUs –25° to +45°C (–13° to +113°F)
5% to 95% non-condensing humidity
Donor Antenna-to-Fusion Wideband Configuratio
n (for each Fusion Wideband Band)
Donor Antenna Installed, inspected; N-male to N-mal
e coaxial cable to lightning
arrestor/surge suppressor
Lightning Arrestor or
Surge Suppressor
Installed between roof-top antenna and repeater; N-male to N-male 50
Ohm coaxial cable and outdoor cables longer than 140 feet.
Repeater Installed between lightning arrestor/sur
ge suppressor and Hub; N-male
to N-male coaxial cable. The Repeater must be a UL listed product.
Attenuator Installed between the circulator and the
Hub downlink port to prevent
overload. Optionally, it may be installed between the uplink port and the
circulator.