Page 88 InterReach Fusion Wideband Installation, Operation, and Reference Manual
© 2013 TE Connectivity Ltd D-620616-0-20 Rev H TECP-77-044 Issue 7 May 2013
5 PathLossSlope: Foraroughestimate,Table68onpage84showsthatabuildingwith80%
hardwallofficesand20%cubicles,
at1920MHz,hasanapproximatepathlossslope(PLS)of
38.1.GiventheRFlinkbudgetof94.5dB,thedistanceofcoveragefromeachRAUwillbe30.2
meters(99ft).Thiscorrespondstoacoverageareaof2,868sq.meters(30,854sq.ft.)per
RAU(referto“Equation2—PathLossEquation”onpage83fordetailsonpathloss
estimation).Forthiscaseweassumedacircularradiationpattern,thoughthe
actualarea
covereddependsuponthepatternoftheantennaandtheobstructionsinthefacility.
6 EquipmentRequired:Sincey
ouknowthebuildingsize,youcannowestimatetheFusion
Widebandequipmentquantitiesneeded.BeforeyoutestanyRFlevelsinthebuilding,youcan
estimatethatfourantennasperlevelwillbeneeded.Thisassumesnopropagationbetween
floors.Ifthereispropagation,youmaynotneedantennasoneveryfloor.
4
antennasperfloor×16floors=64RAUs
64
RAUs÷8=8ExpansionHubs,asthereisamaximumof8RAUsperExpansionHub
8
ExpansionHubs÷4=2MainHubs,asthereisamaximumof4ExpansionHubsperMain
Hub
CheckthatthefiberandCATVcabledistancesareasrecommended.
Ifthedistancesdiffer,use
thetablesinSection6.4,“SystemGain,onpage616todeterminesystemgainsorlosses.The
pathlossmayneedtoberecalculatedtoassureadequatesignallevelsintherequired
coveragedistance.
Theaboveestimatesassumethatallcablel
engthrequirementsaremet.IfExpansionHubs
cannotbeplacedsothattheRAUsarewithinthedistancerequirement,additionalExpansion
HubsmayneedtobeplacedclosertotherequiredRAUslocations.
AnRFSiteSurveyandBuildingEvaluationisrequiredtoaccurate
lyestablishtheFusion
Widebandequipmentquantitiesrequiredforthebuilding.ThesitesurveymeasurestheRF
losseswithinthebuildingtodeterminetheactualPLS,usedinthefinalpathlossformulato
determinetheactualrequirementsoftheFusionWidebandsystem.