User Manual
ADCP-75-115 • Issue A • August 2001
Page 16
©
2001,
ADC
Telecommunications,
Inc.
Figure 9. Connectorizing Door Open Switch
9 FINAL TEST AND ADJUSTMENTS
When
the
installation
is
completed,
refer
to
the
Digivance
Single
Band
LRCS
Installation
and
Operation
Manual
(ADCP-75-116)
for
system
turn-up
and
test
procedures.
This section under construction
16791-A