User Manual

ADCP-75-110 Issue 2B July 2001
Page 39
©
2001,
ADC
Telecommunications,
Inc.
5.
Dress
and
secure
cable
per
standard
industry
practice.
6.
When
all
units
of
the
Digivance
ICS
have
been
installed,
refer
to
Section
4
of
this
manual
for
the
system
power
up
and
test
procedures.
3.12 Create As-Built Drawing
Following
installation,
create
an
“as-built”
drawing
of
the
complete
Digivance
ICS
system.
Using
a
drawing
of
the
building
floor
plan,
show
the
installed
location
of
each
piece
of
equipment
including
the
various
Digivance
electronic
units,
the
antennas,
the
interface
units,
and
the
microcell
(if
used).
In
addition,
show
the
location
and
routing
of
all
copper,
coaxial,
and
fiber
optic
cable
runs
used
with
the
system.
Retain
the
as-built
drawing
for
reference
when
troubleshooting
or
when
planning
for
system
expansion.