User's Manual Part 2
Table Of Contents
- SECTION 3: OPERATION
- 1 BEFORE STARTING OPERATION
- 2 TURN-UP SYSTEM AND VERIFY OPERATION
- 2.1 Reference Procedure: Determine Forward Path Input Signal Level
- 2.2 Reference Procedure: Enter Site Name and Site Number
- 2.3 Reference Procedure: Enter Host Forward Attenuation
- 2.4 Reference Procedure: Determine Output Signal Level at RU Antenna Port
- 2.5 Reference Procedure: Enter Remote Forward Attenuation
- 2.6 Reference Procedure: Enter Host Reverse Attenuation
- 2.7 Reference Procedure: Enter Host Forward and Reverse Delay
- SECTION 4: MAINTENANCE
- SECTION 5: GENERAL INFORMATION