User Manual

ADCP-75-126 Issue B April 2002 Section 4: Operation
Page 4-2
©
2002,
ADC
Telecommunications,
Inc.
1.2 Readiness Check
Before
starting
the
turn-up
process,
inspect
the
complete
LRCS
system
to
verify
that
all
components
of
the
system
are
ready
to
be
powered-up.
This
will
ensure
that
no
units
of
the
system
will
be
damaged
during
turn-up
and
that
all
existing
systems
will
continue
to
function
properly.
1.2.1 Host Unit Installation Checks
Complete
the
following
checks
at
the
HU
prior
to
starting
the
turn-up
process:
1. Verify
that
the
ON/OFF
switch
on
the
HU
is
in
the
OFF
position
(press
O).
2. At
the
fuse
panel,
install
a
3
Amp
GMT
fuse
in
the
circuit
that
supplies
DC
power
to
the
HU.
3. Using
a
DC
voltmeter,
verify
that
the
DC
voltage
level
at
the
HU
power
terminals
is
between
±
24
or
±
48
Vdc
(can
be
either
polarity).
4. Verify
that
all
electrical
and
optical
connections
have
been
completed
and
that
all
optical
fibers,
coaxial
cables,
and
wires
are
properly
routed
and
secured.
1.2.2 Remote Unit Installation Checks
Complete
the
following
checks
at
the
RU
prior
to
starting
the
turn-up
process:
1. Verify
that
the
ON/OFF
switch
on
the
STM
is
in
the
OFF
position
(press
O).
2. Verify
that
the
RF
ON/OF
switch
on
the
LPA
in
the
OFF
position.
3. At
the
AC
breaker
box,
close
the
circuit
breaker
for
the
circuit
that
supplies
AC
power
to
the
RU.
4. Using
an
AC
voltmeter,
verify
that
the
AC
voltage
level
at
the
AC
outlet
is
between
110
and
120
Vac
(for
120
Vac
powered
systems)
or
between
220
and
240
Vac
(for
240
Vac
powered
systems).
5. Verify
that
all
electrical
and
optical
connections
have
been
completed
and
that
all
optical
fibers,
coaxial
cables,
and
wires
are
properly
routed
and
secured.
2 TURN-UP SYSTEM AND VERIFY OPERATION
The
process
of
turning-up
the
system
and
verifying
operation
involves
powering
up
the
various
system
components,
verifying
that
the
LED
indicators
show
normal
operation,
setting
the
site
number
and
name,
adjusting
the
RF
signal
levels,
and
adjusting
the
path
delay.