User Manual
ADCP-75-136 • Issue 1 • November 2002
Page 25
©
2002,
ADC
Telecommunications,
Inc.
3.
Conduct
an
initial
performance
evaluation
and
complete
the
following:
a)
Confirm
proper
isolation,
signal
quality,
and
power
levels.
b)
Make
test
calls
from
DRU
service
area
and
evaluate
call
quality
(confirm
with
service
provider
if
desired).
c)
Address
performance
issues
as
needed.
4.
Install
the
remaining
DRU’s
and
also
any
DEU’s
as
described
in
the
Digital
Expansion
Unit
Installation
Instructions
(ADCP-75-111).
Test
call
quality
and
range
of
each
DRU
as
needed.
5.
Check
powering
and
alarm
functions
of
entire
system
per
Digivance
ICS
specifications.
3.10.4 Phase Four - Performance Evaluation
Complete
the
following
to
evaluate
the
performance
of
the
Digivance
ICS:
1.
Evaluate
the
forward
path
(downlink)
and
reverse
path
(uplink)
RF
signal
levels
and
quality.
2.
Make
continuous
calls
from
DRU
to
DRU,
checking
all
service
areas,
seams,
and
coverage
boundaries
for
call
quality
(both
DL
and
UL).
Address
all
quality
issues
as
needed.
3.
Place
calls
both
leaving
and
entering
the
building(s),
in
parking
lots,
etc.
Address
all
quality
issues
as
needed.
4.
Contact
client/service
provider
to
inform
them
when
the
Digivance
ICS
is
operational.