10. Use the interface device to slowly increase the level of the forward path RF signal
supplied to the DHU. Make all adjustments to the signal level in 1 dB increments.
Caution: Do not supply the DHU with an RF input signal that is 0 dBm or greater or the
system could be damaged.
11. Continue to increase the forward path RF signal level until the DHU overdrive LED just
begins to turn red.
12. Reduce the level of the RF input signal by 1 dB and then verify that the DHU Overdrive
LED stays green.
5.3.2 Reverse Path RF Signal Level Adjustment
The level of the reverse path composite RF signal output from the interface must be adjusted
so that the correct RF signal level is input to the BTS or the antenna. When the level of the
reverse path signal at the DRU antenna port is at a composite maximum of –40 dBm, the level
of the RF output signal from the DHU will be –30 dBm. This equals a system gain of 10 dB.
Use the following procedure to adjust the reverse path RF signal level:
1. Complete all remaining reverse path coaxial cable connections .
2. Determine the maximum acceptable DRU path loss per the system design specifications.
3. Determine the total cable loss that will be imposed by the reverse path coaxial cables and
any other devices (splitters, connectors, etc) that will impose a lose on the signal.
4. Determine the total gain that will be provided by the DRU antenna and by the donor
antenna (if present).
5. Use the following formula to calculate the total gain or loss that must be added by the
interface device to provide unity gain:
Reverse Path Gain/Loss Required = [∑ System Insertion Loss + Designed Path Loss*] –
[System Gain (10 dB) + ∑ Antenna Gain]
*Designed path loss is defined as the loss between a BTS antenna and a donor site antenna.
6. Adjust the interface device to provide the amount of gain or loss required per the
calculation in step 5.
5.4 Test System Performance
Testing the performance of the system involves completing various RF tests and telephone
service tests that verify if the system is functioning properly. Use the following procedure to
test the system performance:
1. Verify that the forward path (downlink) input signal level at the DHU is optimized. Refer to
the High Power Conditioning Panel User Manual (ADCP-75-175) or the Remote Interface
Unit User Manual (ADCP-75-178) for the adjustment procedure.
Note: In a CDMA system, the power level is dependent on the traffic. For optimum
operation in a CDMA system, the input signal level should be set below the level of the
pilot signal.