User's Manual

Table Of Contents
PN 8700-10 Help Hot Line (U.S. only): 1-800-530-9960 9-5
620003-0
PRELIMINARY Replacing a Main Hub
Replacing a Main Hub
1. Turn off the power to the Main Hub.
2. Disconnect all fiber cables and the AC power cord.
3. Replace the Main Hub with a new one.
4. Connect the AC power cord and all fiber cables – remembering to clean and cor-
rectly connect the uplink and downlink fiber cables.
5. Connect the null modem cable to the PC and then to the Main Hub’s front panel
DB-9 serial connector.
6. Start the AdminManager software.
7. Select the Installation Wizard option from the introductory window.
8. Turn on the power to the Main Hub.
AdminManager Tasks
Use the Installation Wizard to:
Set the Operation Band
Use the Configuration & Maintenance panel to:
Set Callback Number
Set Contact Sense Properties
Set System Parameters
Perform System Test
During the System Test the system is out-of-service and no RF is being trans-
mitted. Choose a time of day to perform the System Test that will have the least
impact on the system.