User's Manual
PN 8100-40 Help Hot Line (U.S. only): 1-800-530-9960 9-5
620004-0 Rev. B
Installing the Main Hub
9.2.3 Main Hub Installation Procedures
Procedures in this section:
• Installing the Main Hub in a Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
• Connecting Power and Powering Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6
• Installing an Optional Cable Manager in a Rack . . . . . . . . . . . . . . . . . . . . . . . . 9-6
• Connecting the MMF cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7
• Check the Main Hub Functionality LEDs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-8
• Check the Main Hub MMF Port LEDs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-8
• Connecting a Main Hub to a Roof-top Antenna . . . . . . . . . . . . . . . . . . . . . . . . 9-9
Installing the Main Hub in a Rack
The Main Hub (1U high) mounts in a standard 19 in. (48.3 cm) equipment rack.
Allow front and rear clearance of 7.6 cm (3 in.) for air circulation.
The Main Hub is shipped with #10-32 mounting screws. Another common rack
thread is #12-24. Confirm that the mounting screws match the racks threads.
1. Insert spring nuts into rack where needed or use existing threaded holes.
2. Place the Main Hub into the rack from the front.
3. Align the flange holes with the spring nuts installed in Step 1.
4. Insert the mounting screws in the appropriate positions in the rack.
5. Tighten the mounting screws.