User's Manual Part 2

3-8 LGCell Site Planning and Design
585 EAST BROKAW ROAD | SAN JOSE, CA 95112 | TEL 408.487.2400 | FAX 408.487.2410
End-User Contact:
# of Carriers:
BHCR: Erlangs/Sub:
1 =
2 = 3 = 4 = 5 =
6 = 7 = 8 = 9 = 10 =
Yes No Don't Know
Locations for Main & Expansion Hubs Available (closets):
Estimated Installation Start Date (Must Provide If Services are Needed):
Type of System Enhancement:
If BTS, what Manufacturer & Model #:
If BTS, what is the # of Subscribers:
What is the desired downlink power at mobile (dBm):
Are Exposed Antennas Tolerated Inside:
Are Floor Plans Available (Including Map Scale):
Site Survey Questionaire
Address:
Address:
Phone:
Company Name:
Frequency(ies):
Protocol(s):
E-Mail:
Add'l Comments:
(Special install
requirements, covered
areas
,
contacts
,
e
t
If so, which Services:
- Project Management:
Are 19" Equipment Racks Available:
Is AC Power available at the Main and Expansion Hubs:
Are Multimode Fiber Optic Cables Already Available:
- Site Survey:
- LGCell Equipment Install & Commissioning:
- CAT5, MMF, Coax & Antenna Installation:
Are CAT 5 UTP/STP Runs Already Available:
Are LGC Wireless Services Required:
Are Exposed Antennas Tolerated Outside:
Is Coverage Required Out Doors:
If Floor Plans are not available, how many Buildings are to be Covered:
How Many Floors per Building:
(Use the Add'l comments if needed)
Total Square Footage to Cover per Building:
(Use the Add'l comments if needed)
Project Name:
End-User:
Purchaser: Contact:
Phone:
E-Mail:
YES
YES
NO
NO
Coverage (BDA)
Capacity (BTS)
Wireless Office
1 2 3 4 5
6 7 8 9 10
-75 -80 -85
800
900
1800
1900
GSM TDMA CDMA
DCS
AMPS iDEN
CONFIDENTIAL AND PROPRIETARY
Not to be distributed without prior written consent of LGC Wireless
Ver. 2.0