User's Manual Part 2

PN 8100-40 Help Hot Line (U.S. only): 1-800-530-9960 9-19
620004-0 Rev. E
Installing the Main Hub
9.2.6 Installing Main Hubs in a Neutral Host System
Installing Main Hubs in a neutral host system is the same as described in
Section 9.2.3 on page 9-5.
We recommend mounting all neutral host system Main Hubs in the same rack(s),
grouped by frequency or carrier. For example, group the Main Hubs for the iDEN
carrier(s) together, then the 800 MHz Cellular carrier(s), and so on.
Connecting to base stations and repeaters is the same as described in Section 9.2.4 on
page 9-9 and Section 9.2.4.1 on page 9-14.