User's Manual Part 2

5-4 Connectivity
The following are procedures for connecting two LGC
ell
s. For Dual Band
installations, connect a power combiner/divider for each Main Hub band.
1 Connect Cables
2 Check Main Hub LEDs
After connecting the LGC
ells
, check all Main Hub LEDs to ensure that the
system is operating properly.
Connecting More Than Two LGC
ells
Repeat this procedure to connect any number of LGC
ell
systems. For three systems,
use a 3x1 power combiner/divider, and so on.
Connecting LGC
ell
to Base Stations, Microcells, or
Picocells
One or more LG
Cell
systems can connect with any base station, microcell, or
picocell. Before connecting an LG
Cell
system to one of these, confirm the
following items:
Connector type (LG
Cell
uses N-type connectors)
Power distribution (LG
Cell
supports either duplex or simplex)
Maximum power output (dBm) (Do not exceed the maximum input power into
the Main Hub. If the input power is too high, an attenuator might be required.)
For more information about connections to microcellular base stations or picocells,
including connections to multiple base stations, see the
Integration Module
Installation and Reference Manual
.
From LGC
ells
to Hybrid Power
Combiner/Divider
To Roof-Mounted Antenna, Repeater,
or MBS
Connect the DUPLEX, FORWARD, or
REVERSE
connector of one of the Main
Hubs to an input/output port on the power
combiner/divider using an N-male to N-
male coaxial cable jumper.
Connect the combined port of the power
combiner/divider to a roof-mounted antenna,
repeater, or MBS using an N-male to N-male
coaxial cable jumper.
Connect the
DUPLEX, FORWARD, or
REVERSE connector of the second Main
Hub to the second input/output port on the
power combiner/divider using an N-male to
N-male coaxial cable jumper.