User's Manual

Table Of Contents
78 Link CX User Manual, Version A
83 Verify that the electrical connections are correct. Use Table 4-10 to sign off the individual
checks.
The next series of acceptance tests requires you to log in to the built-in web server with a computer
equipped with a web browser.
84 Connect your computer to the Link CX through the Ethernet equipment connected to the
ETHERNET 1 or ETHERNET 2 port.
85 Log in to the Link CX built-in web server to display the Monitor page as described in
Section 4-2.2.
86 Make sure the Automatic Tx Power Control indicated in the lower half of the Monitor page is
set to Disabled.
87 Record the RSSI indicated at the top of the Monitor page. Save this number for later
troubleshooting.
Table 4-10 Electrical Connection Checklist
Checklist Item Verified Inspector Date
Is the proper voltage supplied to the Link CX
(PWR/LCL ALM LED on)?
Is the Link CX receiving signal from the radio link
(RF LINK LED on)?
When the Link CX is connected to DS-3
equipment, is the Link CX receiving the expected
signal (DATA LED on)?
When the Link CX is connected to Ethernet
equipment on port ETHERNET 1, is the Link CX
receiving the expected signal (ENET 1 LED on or
flashing)?
When the Link CX is connected to Ethernet
equipment on port ETHERNET 2, is the Link CX
receiving the expected signal (ENET 2 LED on or
flashing)?