Installing the Link CX 77
4-7 Acceptance Testing
This section describes the tests used to verify that the Link CX data input circuitry, near-end Link CX
radio, radio link, and far-end Link CX radio are installed properly and operating correctly.
82 Verify that the physical installation is correct. Use Table 4-9 to sign off the individual checks.
Table 4-9 Physical Installation Checklist
Checklist Item Verified Inspector Date
Is the mounting pipe securely connected to the
mounting structure?
Is the Link CX securely connected to the
mounting pipe?
If equipped, is the external antenna securely
connected to the mounting pipe?
Is the lightning protection above the Link CX and
antenna properly grounded?
Is the Link CX properly grounded?
If equipped, is the external antenna properly
grounded?
Is the lightning arrestor at the entry to the
equipment enclosure properly grounded?
Is all cabling to the Link CX properly routed (no
sharp bends and properly attached)?
Are all exposed connectors properly sealed
against moisture?
Are all unused connectors capped off or
otherwise sealed against moisture?
Is the internal or external antenna polarization
correct (as indicated on the back of the unit)?