User's Manual
Table Of Contents
- interWave WaveNet Link CX User Manual
- One - System Description
- 1-1 General
- 1-2 System Overview
- 1-3 Features
- 1-4 LinkCX Basic Structure
- 1-4.1 Radio Links
- 1-4.2 Data Stream
- 1-4.3 LinkCX Models
- 1-4.4 Mounting and Antenna Alignment
- 1-4.5 Interface Connectors and Indicators
- 1-4.6 Cables
- 1-4.7 Integral Antenna
- 1-4.8 External Antenna
- 1-4.9 Configuration, Operation, and Monitoring
- 1-4.10 SNMP
- 1-4.11 LinkCX Network Management Architecture
- 1-4.12 NMS Connectivity
- 1-4.13 Web-Based GUI Access Security
- 1-4.14 GUI Functions
- 1-5 Typical Applications
- 1-5.1 Internet (ISP)
- 1-5.2 Private Network Wireless Bridged LANs and WANs
- 1-5.3 PCS/PCN and Cellular Networks
- 1-5.4 Wireless Local Loop Networks and Local Exchange Bypass
- 1-5.5 Business Bypass and Local Exchange Bypass
- 1-5.6 Backhaul for Wireless MTU and MTU Access
- 1-5.7 Wireless Mesh Backhaul Networks
- 1-5.8 Wireless ATM Mesh Distribution with StreamNet
- 1-6 Specifications
- Two - Installation Steering Guide
- Three - Installation Planning
- Four - Installing the Link CX
- Five - Final Link CX Setup
- Six - Monitoring and Trend Analysis
- Seven - Troubleshooting the Link CX
- Appendix 1 - Interface Cable Pinouts
- Appendix 2 - Technical Specifications
- Appendix 3 - Using the Web-Based GUI User Interface
- Appendix 4 - Grounding and Lightning Protection
- Appendix 4 - Enterprise MIBs and Traps
66 Link CX User Manual, Version A
Radome Installation
Molded radomes (normally optional on standard antennas) should be installed following the instructions
provided.
Azimuth Adjustment Clamp/Shear Stop Installation
39 Verify proper assembly of the azimuth clamp/shear stop clamp as shown in Figure 4-28 and
Figure 4-29. Securely attach the shear stop clamp to the mast pipe as shown, orienting it as
nearly as possible to the antenna boresight direction, and square to the mast axis. Note that
the shear stop clamp used on the two foot antennas also provides the azimuth adjustment.
40 Refer to Figure 4-14 for the position of the antenna centerline relative to the shear stop
clamp. The clamp must be mounted to provide support during installation and azimuth
adjustment.
Figure 4-27 Feed Horn Installation for Vertical Polarized Operation
Figure 4-28 Azimuth Clamp/Shear Stop Assembly