Commissioning Checklist 87
Checklist 3
Commissioning Checklist
80000
Off-Line Commissioning
Pre-Commissioning Visual Checks
At the Depot
1 __
Power to BTS is off.
2 __ BTS connected to power source.
3 __ BTS grounded.
4 __ Equipment cables labeled and secured.
5 __ Cards seated securely.
On-Site
1 __
Installation secure.
2 __ Power to BTS is off.
3 __ BTS connected to power source.
4 __ BTS grounded.
5 __ Equipment cables labeled and secured.
6 __ Cards seated securely.
7 __ Transmission cables available and labeled.
Compliance Checks
1 __ Cross check with site specific data to ensure BTS is correctly configured with all cards.
2 __ Serial number of all cards recorded.
3 __ Verify correct operating voltage supplied: 230 VAC, 115 VAC, -48 VDC.
Powering On the BTS
1 __ Disconnect all E1 and/or T1 cables from BTS (if connected).
2 __ Turn power to BTS on.
3 __ All card power LEDs and processor and E1 or T1 ON LINE LEDs are green.
Site Name
IP Address
IP Name (optional)
BSC Name
MSC Name
Site/Access Phone Number