86 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
Mounting
1 __ Attach mounting brackets to chassis
2 __ Ground chassis
3 __ Connect power supply: 115 VAC, 230 VAC, -48 VDC
Checking VSWR
VSWR measurements are performed by the operator to verify the installation of external antennas.
1 __
VSWR measurement on TX antenna 1
2 __ VSWR measurement on TX antenna 2 (if applicable)
3 __ VSWR measurement on TX antenna 3 (if applicable)
Connecting the BTS
1 __ Connect “Abis Interface” E1 and/or T1 trunk cables to local telephone provider demarcation point
2 __ Configure E1 or T1 trunk card DIP switch settings
3 __ Ensure power to BTS is off
Verifying the BTS-BSC Link
It is the operator’s responsibility to verify that all BTS-BSC E1 and/or T1 links are ordered, installed and
certified by the local telephone provider.
Verify bit error rates on a nominal 20 minute soak test on the E1 and/or T1 Abis-interface (end-to-
end BER test to include E1 and/or T1 trunk cables)