Site Readiness Checklist 83
Checklist 1
Site Readiness Checklist
60000
Environmental requirements
1 __ Ground and soil resistance measured
2 __ Air conditioning available
Electrical requirements
1 __ Site ground plate/ring installed and grounding rods connected
2 __ Grounding bar Installed on shelter/cabinet and bonded to site ground plate/ring
3 __ Main feeder bend radius verified
4 __ Power cable entry supports/conduits installed
5 __ Main power cable installed and ready for connection
6 __ Power utility meter installed and connected
7 __ Main power supply available
8 __ MCC & MNC frequencies assigned and confirmed
9 __ Local electrician/ power provider available
Chassis requirements
1 __ Shelter/Cabinet anchored in position
2 __ Foundation pad for shelter/cabinet constructed
3 __ Backbone trunking equipment and installation material on site
4 __ Shelter/Cabinet waterproofed
5 __ PLMN/PSTN/E1/T1 lines installed (BER link measurements)