User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
76 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
Test 3
A If the second external alarm is used, close the alarm relay (i.e. trigger the second
customer-defined alarm).
B After a delay, the OMC operator must observe an alarm event.
C Close the alarm relay by opening the alarm contact.
D After a delay, the alarm state displayed at the OMC changes from open to closed.
TCH Timeslot Tests
1 In this test, the OMC operator unlocks individual TCH timeslots and the field technician
places a mobile-to-mobile call over each timeslot using a mobile handset in debug mode.
Refer to the documentation provided by the module handset manufacturer for the proper
procedures.
For each timeslot, the commissioner should verify that:
• The timeslot displayed on the handset corresponds to the timeslot unlocked by the
OMC operator.
• A two-way call is completed successfully.
• The call has good audio quality and power, and low interference.
The number of timeslots to be tested differs depending on whether you have one, two or
three TRXs. Table 5-1 provides the sequence for 1 TRX, Table 5-2 provides the sequence
for 2 or more TRXs.
Table 5-1 Timeslots Needing Testing in a One-TRX BTS
TRX Number Timeslot Number Channel Type Testing Necessary
First TRX (TRX in Slot 6)
0 BCCH Combined No
1 TCH Yes
2 TCH Yes
3 TCH Yes
4 TCH Yes
5 TCH Yes
6 TCH Yes
7 TCH Yes
Note: To run an abbreviated version of this test, test any one of timeslots 0-3 and of
timeslots 4-7 on each TRX.