User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Off-Line Commissioning 61
Establishing a Telnet Communications Session
1 In an Xterm window, terminate the serial connection by pressing the [~] key and then the
[.] key:
bts-> ~.
The prompt now changes back to build@craftpc:~>.
2 Verify that you can establish a telnet communications session by typing:
build@craftpc:~> telnet iwbox [ENTER]
3 The Craft PC prompt now changes to bts->. This prompt verifies that the telnet session
can be established. If this is not the case, verify the Ethernet wiring and retry.
Terminating a Telnet Communications Session
After verifying that a telnet communications session can be established, terminate the telnet session as
follows.
4 Terminate the telnet communications session by typing:
bts-> logout [ENTER]
The return message should read “Connection closed by foreign host” and the
prompt changes back to
build@craftpc->.
3-3.5 Running TRX POST Diagnostics
This section explains how to use the Craft PC to run the TRX POST diagnostics on the BTS.
For more information about the Craft PC, please refer to the interWAVE
Craft PC Guide.
If the Craft PC hangs when attempting to establish a telnet session,
press the key combination [CTRL][c] to abort the failed connection.
Check the boot parameters and repeat the connection procedures. Also
verify that the Craft PC host table contains the hostname of your
equipment in reference to the default IP address.
Once a telnet session has been established between the Craft PC and
the processor card, it must be terminated before the Craft PC is
powered off. FAILURE TO DO THIS WILL RESULT IN A HUNG
CONNECTION ON THE BSS SYSTEM.