User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
54 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
Figure 3-5 LED Sequence During the Boot Process
ICP E1/T1 TRX
Power on BTS. Initial LED display is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
OFF
ON
ON
N/A
N/A
N/A
ON
ON
ON
ON
ON
LED display after 35 seconds is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
N/A
OFF
N/A
N/A
ON
ON
ON
ON
ON
ICP code loads. LED display during download is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
ON
N/A
N/A
N/A
ON
ON
ON
ON
ON
OFF
ON
ICP downloads code to E1 or T1 card. LED display
(1 minute for each card) during download is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
ON
N/A
N/A
N/A
ON
OFF
OFF
OFF
ON
BSS ICP completes TRX code download to each
card sequentially. The final LED display is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
ON
N/A
N/A
N/A
ON
OFF
OFF
OFF
ON
OFF
ON
IW022303
TRX
N/A
ON
ON
OFF
N/A
N/A
TRX
N/A
ON
ON
OFF
N/A
N/A
TRX
N/A
ON
ON
OFF
N/A
N/A
TRX
N/A
ON
ON
OFF
N/A
N/A
TRX
N/A
ON
N/A
N/A
OFF
OFF
Note that the TRX FLT LED will stay illuminated until the TRX software
has been downloaded from the hard drive.
TRX code downloads from remote BSS processor card.
LED display during download is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
ON
N/A
N/A
N/A
ON
OFF
OFF
OFF
ON
FLASH
TRX
N/A
ON
OFF
N/A
N/A
ON
OFF
OFF
OFF
OFF
ON
OFF
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
ON
LINE
FLT
PWR
PORT 1
12
PORT 0
12
ALARMS
ALARMS
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
120 OHM
ONLINE
PWR
FLT
SCN
CON
ENET
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX