User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Off-Line Commissioning 53
3-2.3 Power-On LED Tests
This section describes how to power-on the BTS and verify that the cards in the system come up
properly by viewing the LEDs on the front panel. The purpose of these tests is to verify that the LEDs
come up in the correct state, indicating that the system is operating normally.
When you power-on the BTS, it automatically runs its power on self tests (POST), downloads software to
the TRX cards, then attempts to bring up the cards. While it is bringing up the cards and when it is
finished, the LEDs indicate the state of the each card.
Use the following procedure:
1 Power on the BTS by depressing the power buttons illustrated in Figure 2-8.
2 Verify that the front-panel LEDs flash in the sequence shown in the following figure:
Figure 3-4 LED Locations
The POST tests will be used later. You can ignore them for now.
IW010302
ON
LINE
FLT
PWR
PORT 1
12
PORT 0
12
ALARMS
ALARMS
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
120 OHM
ONLINE
PWR
FLT
SCN
CON
ENET
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
012345678
Processor card LEDs
Trunk card LEDs
TRX LEDs