User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
52 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
The following figure shows a physical ethernet port connection between the Craft PC and the ICP
processor card:
C
3-2.2 Starting XWindows Using the Craft PC
In this chapter, you will use the Craft PC to verify the software configuration and other aspects of the
BSC operation. This section describes how to start the Craft PC and the Windows environment while
subsequent sections will provide connection, test and verification procedures. For information
regarding the Linux based Craft PC, see the interWAVE Craft PC Guide
.
Starting XWindows from Windows NT/2000/XP
1 With your left mouse button, double click the Craft PC icon on the desktop.
2 If you get an error message, or if the XWindows environment does not allow you to create
new XWindows, stop the CPC environment by pressing
[ALT-F4] and restart the
environment.
The XWindows environment now starts.
Figure 3-3 Connection to the Craft PC via the ICP Ethernet Port
The following sections describe procedures performed using the
Craft PC. For more information pertaining to the use of the Craft PC,
please refer to the interWAVE Craft PC Guide
. Note that all commands
in bold are those entered by the user.
IW085201
Ethernet
Port
RJ-45 Ethernet
Crossover cable
Ethernet
Transceiver
PCMCIA
card slot
Craft PC
ON/LINE
PORT 1
12
PORT 0
12
ALARMS
FLT
PWR
ALARMS
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
ONLINE
PWR
FLT
SCN
RST
CON
ENET
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX