User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Installation 33
You will attach an elbow connector and your antenna cable to the external RF connector associated with
the internal RF connector shown in the appropriate figure.
The subsequent sections identify the cable routing for the different BTS antenna configurations that you
identified in Chapter One. You must install the antennas such that the general population is kept at least
164-inches from the main beam of the antenna. For more information of RF radiation properties of the
UltraWAVE, refer to Section 2-6.17.
Proceed to the appropriate subsection to connect your site-specific antenna cable configuration.
2-6.1 Omni 1 TRX (O1) Configuration
This is a 50 watt (47 dBm) two antenna configuration available in either 850 MHz or 900 MHz
frequencies. Connect your antennas as shown in Figure 2-14.
All RF cabling must be completed with the chassis powered off and,
preferably, with the power cable disconnected from the cabinet.
Do not disconnect RF coaxial connectors on the interWAVE equipment
or antenna systems while the radio equipment is operating.
Never
place any body part over or look into any RF connector while the radio
equipment is transmitting.
Radio frequency signal levels that give rise to hazardous radiation levels
can exist within the transmitter, power amplifiers, associated RF
multiplexers and antenna systems.
Figure 2-14 Antenna Cabling for O1 Configuration
RF modules
IW009305
ANT
DIV
ANT
MAIN
Internal RF connector
External RF connector
Antenna 1
Diversity
Antenna connection
1 2 3 4 50
Not UsedNot Used Not Used Not Used
Antenna 1
Main