User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
30 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
Figure 2-11 illustrates the pinout for the RJ-48C to DSUB 120 Ohm conversion cable.
2-5.2 T1 Cables
T1-100 Ohm
For T1 connections, the proper cable is individually shielded twisted pair with a nominal impedance of
100 Ohm +/-5% at 772 kHz. The maximum allowable cable distance depends directly on the insertion
loss of the cable at 772 kHz. The T1 card can accommodate up to 9 dB of cable loss. When using
22 AWG ABAM cable, 9 dB of loss is approximately 2000 feet. When using Belden type 9729 (with a
cable loss of 6 dB per 1000 feet at 772 kHz) the maximum cable distance is approximately 1500 feet.
Table 2-9 provides a description of cables required for installation and connection to a T1 network, but
not supplied with the BTS:
Figure 2-11 120 Ohm DSUB Conversion Cable
Before connecting T1 lines to the BTS, it is assumed that the quality of
the lines has been verified. It is recommended that bit error rate tests
be completed to ensure that the BER is less than 10
-8
.
Table 2-9 Customer-Supplied T1 Cabling
Cable Identity Cable Type Corresponding Cable Plug
T1, 100 Ohm Shielded, Twisted, 2-Pair RJ-48C, Male
Note: The number of cables required depends on the ordered configuration of the BTS.
3
11
1
9
IW009303
8
ORANGE/WHITE
BLUE/WHITE
WHITE/ORANGE
WHITE/BLUE (R-TIP)
(R-RING)
(T-TIP)
(T-RING)
1
2
3
5
6
7
4
J2
J1
Pin 9
J1
J2
Pin 1
Pin 15 Pin 8
Pin 1
Pin 8