User's Manual

Table Of Contents
26 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
AC Operation
The BTS is shipped from the factory with the internal cabling routed from the AC power supply subrack
assembly to a molex connector on the top rear of the cabinet. A power supply cable is included with the
BTS which should be used to connect to your AC power supply or battery backup system.
Make connections from the AC power supply to the cabinet as follows:
1 Verify the ground connection you made in Section 2-4.1 is secure.
2 Make sure that the power button located on all power supply modules is in the raised OFF
position. See Figure 2-8 for the location of the power supply power buttons.
3 Plug the molex power connector into the power connection on the top of the cabinet.
Secure the connector by twisting the connector sleeve until the lines on the cable connector
and chassis connector align.
4 Plug the power cable into the electrical mains. Do not apply power to the chassis at this time.
Wait until you are performing the off-line commissioning procedures in the next chapter.
Figure 2-8 Power Supply ON/OFF Buttons
CAUTION: THE POWER SUPPLY CORD IS USED AS THE MAIN
DISCONNECT DEVICE, ENSURE THAT THE SOCKET-OUTLET IS
LOCATED/INSTALLED NEAR THE EQUIPMENT AND IS EASILY
ACCESSIBLE.
ATTENTION: LE CORDON D'ALIMENTATION EST UTILISÉ COMME
INTERRUPTEUR GÉNÉRAL. LA PRISE DE COURANT DOIT ÊTRE SITUÉE
OU INSTALLÉE À PROXIMITÉ DU MATÉRIEL ET ÊTRE FACILE D'ACCÉS.
Warnung: Das Netzkabel dient als Netzschalter. Stellen Sie sicher, das
die Steckdose einfach zugänglich ist.
ON/OFF Buttons
INPUT
OUTPUT
FAULT
OFF ON
INPUT
OUTPUT
FAULT
OFF ON
INPUT
OUTPUT
FAULT
OFF ON
IW008302