User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Installation 15
The cabinet is mounted on casters and may be carefully moved from the unpacking site to its final
mounting location. The cabinet has four rubber which will raise the cabinet off of the castors. The
dimensions for the engagement height of the rubber feet is shown in Figure 2-1. If you have alignment
pins mounted in your concrete pad, use the procedure in this section.
If you do not have the alignment pins, Figure 2-3 illustrates the location of eight M10 tap holes which
may be used for additional mounting studs, eye hooks or angle brackets for securing the BTS cabinet in
its final location.
Figure 2-3 Cabinet Dimensions
• Make sure the ambient temperature around the unit (which may be
higher than the room temperature) is within the limit specified for the
unit.
• Make sure there is sufficient airflow around the unit.
• Make sure electrical circuits are not overloaded - consider the
nameplate rating of all the connected equipment, and make sure you
have over current protection.
• Make sure the equipment is properly grounded.
• Make sure no objects place on top of unit.
22.280 in.
[56.59 cm]
20.547 in.
[52.19 cm]
Tapped hole
M10-1.5 x4 places
21.280 in.
[54.05 cm]
40.904 in.
[103.90 cm]
0.750 in.
[1.91] cm
Cabinet (side)Cabinet (top)
Tapped hole
M10-1.5
x4 places
IW021302