User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Installation 13
2-1.3 Chassis Requirements
Before installing the BTS, ensure that adequate clearing space is allowed around the unit. The BTS
should be installed away from salt spray and in an area where there are minimal vibrations. Table 2-4
shows the dimensions of the BTS. For detailed cabinet dimensions, see Section 2-2.
BTS power protection: -48 VDC dedicated 45 amp fuse/circuit breaker
Table 2-4 BTS Cabinet Dimensions
Weight
(Maximum Configuration)
Height Width Depth
Metric 213 Kg 105.1cm 56.0 cm 64.77 cm
Imperial 470 lbs 41.38 inches 22.05 inches 25.5 inches
Figure 2-1 Cabinet Dimensions
Table 2-3 Power Specifications (continued)
Power Requirements Specification
WHEEL_SV
WHEEL_SV
WHEEL_FV
WHEEL_FV
WHEEL_FV
DOOR_
FV
CAB_F
CAB_F
V
10 32 54
RUBFE
RUBFE
ET
RUBFE
ET
CAB_S
V
DOOR_
SV
DOOR_
SV
RUBFE
ET
RUBFE
RUBFE
ET
20.925 in. [53.15 cm]
M12-1.75
(each corner)
1.808 in
[4.59 cm]
19.925 in. [50.61 cm]
41.375 in. [105.09 cm]
IW008301
M10 Tap Holes
(each corner)