User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Installation 11
Two
Installation
20000
This chapter provides instructions for installing and configuring the hardware. This includes:
• Verifying site requirements
• Mounting the chassis in its permanent location
• Configuring the E1 or T1 trunk card(s)
• Making the external connections to the BTS
2-1 Site Requirements
Before a site is chosen or equipment installed, a site survey must be carried out. The site survey
checklist assists the surveyor with the inspection and the collection of site specific information such as
environmental conditions, electrical requirements, and mechanical requirements
The site survey checklist must be completed before installation begins. Note that the necessary steps
for site readiness are listed in Checklist 1.The interWAVE Network Implementation Manual
provides
additional detailed site requirements.
The site readiness checklist assists the field service engineer or operator to ensure that the site is ready
for equipment installation. It includes information about:
• Environmental conditions
• Electrical requirements
• Chassis requirements
The site readiness checklist is located in Checklist 1, it must be completed as part of the installation
process.
2-1.1 Environmental Conditions
The BTS is designed to operate indoors only. To facilitate long-term operability and durability of the
BTS, observe specific environmental constraints.
Before installing the BTS, ensure that the operating environment maintains a temperature within the
range shown in Table 2-1.
Make sure the ambient temperature around the unit (which may be
higher than the room temperature) is within the limit specified for the
unit.