User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
6 UltraWAVE BTS Installation and Commissioning Guide, Release 6.5A
Using the example in Figure 1-3, the model number is AUACS24 which corresponds to an
UltraWAVE BTS configured for three sectors with two TRXs per sector (S222).
3 Record your model number and configuration in the Installation Checklist.
1-2.2 Identifying Module Part and Serial numbers
The factory places up to four configuration labels on the front of each BTS card, module, and chassis to
help identify the system configuration. The labels identify the:
• Part description
• Part number
• Revision or dash number
• Serial number
An example of the configuration labels appears in Figure 1-4:
Next two
or three
digits
O1 Omni single TRX (O1); 50 watts, 2 antennas
O2 Omni two TRX (O2); 50 watts, 2 antennas
O3 Omni three TRX (O3); 25 watts, 2 antennas
O4 Omni four TRX (O4); 25 watts, 2 antennas
O5 Omni five TRX (O5); 15 watts, 2 antennas or 25 watts, 3 antennas
O6 Omni six TRX (O6); 15 watts, 2 antennas or 25 watts, 3 antennas
S11 Two sector, one TRX per sector (S11); 50 watt, 4 antennas
S13 Three sector, one TRX per sector (S111); 50 watt, 6 antennas
S21 Two sector, two TRXs per sector (S22); 50 watt, 4 antennas
S22
Three sector, two TRXs in one sector and one TRX in two sectors
(S211); 50 watt, 6 antennas
S23
Three sector, two TRXs in two sectors and one TRX in one sector
(S221); 50 watt, 6 antennas
S24 Three sector, two TRXs per sector (S222); 50 watt, 6 antennas
S32
Two sector, three TRXs in one sector and two in the other (S32); 25
watt, 4 antennas
S33 Two sector, three TRXs per sector (S33); 25 watt, 4 antennas
S41
Two sector, four TRXs in one sector, two in the other (S42); 25 watt,
4 antennas
Table 1-1 Model Number Details (continued)
Digit
Location
Contents Configuration