User's Manual
Table Of Contents
- UltraWAVE BTS 6 Installation and Commissioning Guide
- One - Unpacking and Configuration Verification
- Two - Installation
- 2-1 Site Requirements
- 2-2 Mounting the BTS Chassis
- 2-3 Configuring the E1 or T1 Trunk Card
- 2-4 Connecting Power and Ground Cables
- 2-5 Connecting E1 or T1 Trunk Cables
- 2-6 Connecting Antennas
- 2-6.1 Omni 1 TRX (O1) Configuration
- 2-6.2 Omni 2 TRX (O2) Configuration
- 2-6.3 Omni 3 TRX (O3) Configuration
- 2-6.4 Omni 4 TRX (O4) Configuration
- 2-6.5 Omni 5 TRX (O5) Configuration
- 2-6.6 Omni 6 TRX (O6) Configuration
- 2-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration
- 2-6.8 Sectorized Two TRX (S11) Configuration
- 2-6.9 Sectorized Three TRX (S111) Configuration
- 2-6.10 Two Sector Four TRX (S22) Configuration
- 2-6.11 Three Sector Four TRX (S211) Configuration
- 2-6.12 Three Sector Five TRX (S221) Configuration
- 2-6.13 Three Sector Six TRX (S222) Configuration
- 2-6.14 Two Sector Five TRX (S32) Configuration
- 2-6.15 Two Sector Six TRX (S33) Configuration
- 2-6.16 Two Sector Six TRX (S42) Configuration
- 2-6.17 RF Radiation Hazard
- 2-7 Connecting External Alarms
- 2-8 Post Installation Cabling and Checks
- Three - Off-Line Commissioning
- 3-1 Pre Off-Line Commissioning
- 3-2 Off-Line Commissioning the UltraWAVE BTS
- 3-3 Software verification using Craft PC
- 3-3.1 Verifying the Current Software Version and Patch Level
- 3-3.2 Checking the Flash Version Number
- 3-3.3 Running E1 or T1 POST Diagnostics
- 3-3.4 Verifying Telnet Communications with the BTS over Ethernet
- 3-3.5 Running TRX POST Diagnostics
- 3-3.6 Reviewing POST Results
- 3-3.7 Rebooting the BTS after Running POST
- 3-3.8 Terminating Serial Communications with the BTS
- 3-4 Exiting XWindows on the Craft PC
- 3-5 Upgrading the BTS Software Version (Flash)
- 3-6 Post Off-Line Commissioning
- Four - Off-Line Commissioning of a Daisy Chain
- Five - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
Unpacking and Configuration Verification 1
One
Unpacking and Configuration Verification
10000
This chapter provides instructions for opening the shipping container and inspecting the contents.
When you have completed the procedures in this chapter you will have confirmed that the hardware
arrived undamaged, and that everything you ordered is present and configured correctly.
The procedures in this chapter include:
• Unpacking and inspecting the system. See Section 1-1.
• Inspect the system identification label and verify that this is the system you ordered. See
Section 1-2.
• Inspect the system components, verify and record the part numbers. See Section 1-3.
1-1 Unpacking and Inspecting
Your interWAVE system was packed with great care, and all containers were inspected before shipment.
Upon receipt of these packages, immediately inspect the outside of the shipping containers. If there is
any visible damage, insist that a representative of the carrier be present when unpacking the contents.
Carefully inspect the system as it is unpacked. If any damage, such as dents or broken connections, is
noticeable immediately notify the carrier as well as interWAVE Customer Service.
Store the shipping containers for future use. If the unit has to be returned for upgrade or service, the
specially designed shipping containers assure adequate protection for the equipment. If for some
reason the containers are not reusable or if they are misplaced, please contact interWAVE to order new
containers.
The UltraWAVE BTS is shipped pre-configured in a locking cabinet assembly, shown in Figure 1-1.