User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
UltraWAVE Micro BTS Installation and Commissioning Guide, Version B 57
Connecting Antennas
2.7.4 Sectorized Three TRX (S111) Configuration
The sectorized three TRX (S111) configuration is available as a 15 Watt, 25 Watt,
40 Watt or a 50 Watt six antenna configuration. See Figure 2-16.
This configuration has three sectors with one TRX per sector. For the 15 Watt,
25 Watt, 40 Watt and 50 Watt configurations, connect your antennas as shown in
Figure 2-25.
Table 2-16: Sectorized Three TRX (S11) Configuration Frequencies
Configurations Available Frequencies
15 W (42 dBm) 1800 MHz, 1900 MHz
25 W (44 dBm) 850 MHz, 900 MHz
40 W (46 dBm) 1800 MHz, 1900 MHz
50 W (47 dBm) 850 MHz, 900 MHz
Figure 2-25: Antenna Cabling for S111 Configuration
ANT
DIV
ANT
MAIN
ANT
DIV
ANT
MAIN
RF modules
Internal RF connector
External RF connector
Antenna 1
Diversity
Antenna connection
1 2 3 4 50
Antenna 1
Main
Antenna 2
Main
Antenna 2
Diversity
ANT
DIV
ANT
MAIN
Antenna 3
Main
Antenna 3
Diversity
IW130611
ABC