User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
42 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 2 - Installation
3 Ensure the input power source is turned off and not supplying power to source
power connection.
4 Plug the power cable into the electrical mains or connect the flat washers,
shown in Figure 2-12, directly to the input power source, as follows:
White is the neutral lead
Black is the line lead
Green is the ground lead
5 Plug the round quick disconnect connector as illustrated in Figure 2-12 into
the power connection on the top of the cabinet as illustrated in Figure 2-14.
Secure the connector by twisting the connector sleeve until the lines on the
cable connector and chassis connector align.
If you have ordered the NIB as separate subrack assemblies, you will connect
the input power cable directly to the power supply subrack assembly, shown
in Figure 2-11.
6 Do not apply power to the chassis at this time. Wait until you are
performing the off-line commissioning procedures in the next chapter.
Figure 2-13: AC Power Supply Module ON/OFF Switches
Power Switches
IW138603
INPUT
OUTPUT
FAULT
OFF
ON
UNLOCK
INPUT
OUTPUT
FAULT
OFF
ON
UNLOCK