User's Manual

Table Of Contents
40 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 2 - Installation
Installing DC Power Supply Modules
The customer ordered configuration determines the number of power supply
modules included with the Micro BTS. The power supply modules must be
installed according to the following procedure:
1 Remove the power supply module from the packaging.
2 Insert the power supply module in the first empty slot at the front left of the
subrack assembly.
3 Slide the power supply module into the chassis.
4 Twist the captive screws clockwise to secure the power supply module into
place. If you are connecting directly to the power supply subrack assembly,
Figure 2-11 shows the input power connector location.
Figure 2-11: Power Supply Subrack Connection