User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
28 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 2 - Installation
The cabinet is mounted on casters and may be carefully moved from the
unpacking site to its final mounting location. The cabinet has four rubber feet
which will raise the cabinet off of the casters. The dimensions for the engagement
height of the rubber feet is shown in Figure 2-1. If you have alignment pins
mounted in your concrete pad, use the procedure in this section.
If you do not have the alignment pins, Figure 2-5 illustrates the location of eight
M10 tap holes which may be used for additional mounting studs, eye hooks or
angle brackets for securing the Micro BTS cabinet in its final location.
Figure 2-5: Cabinet Dimensions
• Make sure the ambient temperature around the unit (which
may be higher than the room temperature) is within the
specified limit.
• Make sure there is sufficient airflow around the unit.
• Make sure electrical circuits are not overloaded - consider the
nameplate rating of all the connected equipment, and make
sure you have over current protection.
• Make sure the equipment is properly grounded.
• Make sure no objects are placed on the top of the unit.
22.280 in.
[56.59 cm]
20.547 in.
[52.19 cm]
Tapped hole
M10-1.5 x4 places
19.780 in.
[50.24 cm]
40.904 in.
[103.90 cm]
0.868 in.
[2.21] cm
Cabinet (side)Cabinet (top)
Tapped hole
M10-1.5
x4 places
IW021302