User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
UltraWAVE Micro BTS Installation and Commissioning Guide, Version B 25
Mounting the Micro BTS Chassis
.
5 Connect the alarm cable between the power supply subrack assembly and the
Micro subrack assembly. See Figure 2-3. Secure the cable by tightening the
phillips screws.
6 Connect Power Supply Cable 1 and Power Supply Cable 2 between the power
supply subrack assembly and the Micro BTS subrack assembly. See
Figure 2-3. The connector to the Micro subrack assembly will snap into place,
while you must tighten the round quick disconnect connector by twisting the
connector housing.
Refer to Section 1.5 for more information on cabling and on verifying that cables
are connected correctly.
Figure 2-2: Attaching the Subrack Assemblies
Rack Screws
x8
IE027601
Rack Screws
x4
INPUT
OUTPUT
FAULT
OFF
ON
UNLOCK
INPUT
OUTPUT
FAULT
OFF
ON
UNLOCK
PA1
IN
ANT
DIV
ANT
MAIN
PWR
FLT
ON LINE
ON
OFF
RX1
RX2
RX3
RX4
TX1
DET
TX2
DET
PA2
IN
RX1
RX2
RX3
RX4
PA1
IN
ANT
DIV
ANT
MAIN
PWR
FLT
ON LINE
ON
OFF
RX1
RX2
RX3
RX4
TX1
DET
TX2
DET
PA2
IN
RX1
RX2
RX3
RX4
PA1
IN
ANT
DIV
ANT
MAIN
PWR
FLT
ON LINE
ON
OFF
RX1
RX2
RX3
RX4
TX1
DET
TX2
DET
PA2
IN
RX1
RX2
RX3
RX4
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
ONLINE
PWR
FLT
SCN
CON
ENET
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
I2C
ON
LINE
FLT
PWR
PORT 1
12
PORT 0
12
ALARMS
ALARMS
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
120 OHM
A
B
C
01234567