20 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 2 - Installation
2.1.3 Chassis Requirements
Before installing the Micro BTS, ensure that adequate clearance space is allowed
around the unit. Enough clearance should be provided from the front and back of
the cabinet to fully open the doors. This requires at least 24 inches (61 cm) from
the front and rear doors. The minimum clearance required on either side of the
cabinet is 4.5 inches (11.4 cm) and the minimum clearance required below the
cabinet is 1.8 inches (4.59 cm). The mounting site should also have ample
clearance for the trunk and antenna cables to be attached to the connectors at the
top of the cabinet.
The Micro BTS should be installed away from salt spray and in an area where
there are minimal vibrations.
Table 2-4 lists the dimensions of the Micro BTS chassis.
Table 2-5 lists the weight and dimensions of the power supply rack.
Table 2-6 and Figure 2-1 provide the dimensions of the BTS cabinet. For detailed
cabinet dimensions, refer to Section 2.2.
Table 2-4: Micro BTS Chassis Dimensions
Scale Height Width Depth
Metric 39.93 cm 48.26 cm 43.82 cm
Imperial 15.72 inches 19.0 inches 17.25 inches
Table 2-5: Power Supply Rack Weight and Dimensions
Scale
Weight
(Maximum
Configuration)
Height Width Depth
Metric 23.8 kg
12.5 cm (AC)
13 cm (DC)
48.26 cm 51.44 cm
Imperial 52.35 lbs
5 inches (AC)
5.2 inches (DC)
19.0 inches 20.25 inches
Table 2-6: Micro BTS Cabinet Weight and Dimensions
Scale
Weight
(Maximum Configuration)
Height Width Depth
Metric 166 kg 105.1 cm 56.0 cm 64.77 cm
Imperial 365 lbs 41.38 inches 22.05 inches 25.5 inches