- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
20 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 2 - Installation
2.1.3 Chassis Requirements
Before installing the Micro BTS, ensure that adequate clearance space is allowed
around the unit. Enough clearance should be provided from the front and back of
the cabinet to fully open the doors. This requires at least 24 inches (61 cm) from
the front and rear doors. The minimum clearance required on either side of the
cabinet is 4.5 inches (11.4 cm) and the minimum clearance required below the
cabinet is 1.8 inches (4.59 cm). The mounting site should also have ample
clearance for the trunk and antenna cables to be attached to the connectors at the
top of the cabinet.
The Micro BTS should be installed away from salt spray and in an area where
there are minimal vibrations.
Table 2-4 lists the dimensions of the Micro BTS chassis.
Table 2-5 lists the weight and dimensions of the power supply rack.
Table 2-6 and Figure 2-1 provide the dimensions of the BTS cabinet. For detailed
cabinet dimensions, refer to Section 2.2.
Table 2-4: Micro BTS Chassis Dimensions
Scale Height Width Depth
Metric 39.93 cm 48.26 cm 43.82 cm
Imperial 15.72 inches 19.0 inches 17.25 inches
Table 2-5: Power Supply Rack Weight and Dimensions
Scale
Weight
(Maximum
Configuration)
Height Width Depth
Metric 23.8 kg
12.5 cm (AC)
13 cm (DC)
48.26 cm 51.44 cm
Imperial 52.35 lbs
5 inches (AC)
5.2 inches (DC)
19.0 inches 20.25 inches
Table 2-6: Micro BTS Cabinet Weight and Dimensions
Scale
Weight
(Maximum Configuration)
Height Width Depth
Metric 166 kg 105.1 cm 56.0 cm 64.77 cm
Imperial 365 lbs 41.38 inches 22.05 inches 25.5 inches