User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
12 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 1 - Unpacking and Configuration Verification
1.4 Verifying and Documenting Cards and
Modules
The cabinet contains two subrack assemblies.
The Micro contains:
RF modules responsible for RF power amplification, duplexing and
combining when required
Processor Card, E1 or T1 trunk card, TRX cards, and clock module
The power supply consists of up to two power supply modules and a third slot
covered with a blank panel.
1.4.1 Required Equipment
To verify and record your system configuration, you need:
A copy of the Shipping Checklist. It is one of the papers inside the shipping
container.
A copy of Checklist 2 - Installation Checklist.
1.4.2 Micro Subrack Assembly
The Micro subrack assembly provides three RF slots, starting on the left with slot
A. Depending on your Micro BTS configuration, up to three slots will be required
for RF modules. These modules are shipped pre-installed and cabled from the
factory.
1 Locate the configuration part and serial numbers on your RF modules.
Figure 1-8 illustrates a sample of these labels.
2 Write down the part number, revision number and serial number in Checklist
2 - Installation Checklist.