User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
8 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 1 - Unpacking and Configuration Verification
1.3 Inspecting Components and Recording
Part Numbers
The Micro BTS is shipped with all RF modules and cards installed in the Micro
subrack assembly as ordered by the customer. The Micro BTS components
include:
Micro subrack assembly
Processor card
E1 or T1 card
TRX cards
RF modules
Fan assemblies (located on the back of the chassis)
Clock module
Internal cabling
Blank panel(s)
Power supply modules and subrack assembly
Some of these components appear in Figure 1-6.
Figure 1-6: UltraWAVE Micro Subrack Assembly
RF Modules
Processor Card
E1 or T1 Trunk Card
TRX Cards
Clock Module
PA1
IN
ANT
DIV
ANT
MAIN
PWR
FLT
ON LINE
ON
OFF
RX1
RX2
RX3
RX4
TX1
DET
TX2
DET
PA2
IN
RX1
RX2
RX3
RX4
PA1
IN
ANT
DIV
ANT
MAIN
PWR
FLT
ON LINE
ON
OFF
RX1
RX2
RX3
RX4
TX1
DET
TX2
DET
PA2
IN
RX1
RX2
RX3
RX4
PA1
IN
ANT
DIV
ANT
MAIN
PWR
FLT
ON LINE
ON
OFF
RX1
RX2
RX3
RX4
TX1
DET
TX2
DET
PA2
IN
RX1
RX2
RX3
RX4
IW132601
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
PWR
DET
IN
ON LINE
FLT
RX-B
RX-A
13 MHZ
CLK
TX
OUT
ONLINE
PWR
FLT
SCN
CON
ENET
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
I2C
ON
LINE
FLT
PWR
PORT 1
12
PORT 0
12
ALARMS
ALARMS
IIIIIIIIIIIIIIIIIIIIIIIII
P/N XXXXXX
IIIIIIIIIIIIIIIIIIIIIIIII
S/N XXXXXX
120 OHM
01234567
A
B
C