User's Manual

Table Of Contents
UltraWAVE Micro BTS Installation and Commissioning Guide, Version B 139
Index
Micro BTS
serial communications with ICP processor card 73
mounting Micro BTS chassis 22
N
network integration 121
network integration procedures 114
O
off-line commissioning 67
daisy chain 107
on-line commissioning 111, 114
P
patch level verification 83
pinout
serial 64
post installation
cabling and checks 66
post off-line commissioning 92
post on-line commissioning procedures 129
POST results review 88
power supply
AC 41
connections 41
switch 41
power-on LED tests 76
pre on-line commissioning
requirements 113
prerequisites
network configuration 121
network integration 113, 121
prerequisites to daisy chaining 108
processor card
serial pinout 64
R
rebooting BTS after running POST 89
requirements
pre on-line commissioning 113
reverse power 121