UltraWAVE Micro BTS Installation and Commissioning Guide, Version B 135
Commissioning Checklist
Checking Clock Synchronization
1 __ Verify Micro BTS clock is free of error
Verifying the Database
1 __ Verify Micro BTS database matches Micro BTS physical configuration
Final Commissioning and On-Line Tests
1 __ Reconnect all E1 or T1 cables to telephone provider demarcation
2 __ Power off and then on the BTS locally. Verify that all LEDs are green
3 __ Inform Micro BTS operator that Micro BTS is ready for integration tests
4 __ Leave power to Micro BTS on