User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
134 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Checklist 3 - Commissioning Checklist
Micro BTS Off-Line Commissioning
1 __ Connect the Craft PC to the processor card using a serial and ethernet cable.
2 __ Establish a serial connection.
3 __ Check software version.
4 __ Start NMI.
5 __ Check the Micro BTS configuration database (refer to Steps 6 through 9 below).
6 __ Delete existing database files.
7 __ Verify that all E1 or T1 trunk cards are logically represented.
8 __ Check the serial numbers, revision numbers and part numbers of all E1 or T1
trunk cards.
9 __ Verify that DSP daughtercards are logically represented and tested.
POST Tests
1 __ Verify POST tests successfully passed.
2 __ Exit NMI. Disconnect Craft PC from the Micro BTS.
Connecting the BTS
1 __ Connect all E1 or T1 cables to the telephone provider demarcation at the MSC.
2 __ Connect all E1 or T1 cables to the telephone provider demarcation at the Micro
BTSs.
3 __ Inform Micro BTS operator (ready for on-line tests).
4 __ Leave power to Micro BTS on.
On-Line Commissioning
1 __ Micro BTS in service and connected to external Micro BTSs (if applicable).
2 __ BSC in service and connected to Micro BTS.
3 __ Micro BTS connected to MSC.
4 __ Database questionnaire completed with Micro BTS parameters defined.
5 __ OMC downloaded Micro BTS configuration with correct operational parameters.
6 __ Operator’s responsibility to verify all E1 or T1 links properly installed and certi-
fied by local telephone provider. Certification must rate Length of Testing and
BER results.
Verifying E1 or T1 Operation
1 __ Verify bit error rates on a nominal 20-minute soak test on the Abis interface to
remote Micro BTS(s) if applicable.
2 __ Verify bit error rates on a nominal 20-minute soak test on the A-interface.
Verifying Recovery
1 __ Unlock A-interface, A-Links and Micro BTS objects from Micro BTS.
2 __ Confirm A-interface re-establishes communications to MSC after E1 or T1 dis-
connects.
3 __ Confirm Abis interface re-establishes communications to remote Micro BTS(s)
after E1 or T1 disconnects.