Checklist 1 - Site Readiness Checklist
Environmental requirements
1 __ Ground and soil resistance measured.
2 __ Air conditioning available.
Electrical requirements
1 __ Site ground plate/ring installed and grounding rods connected.
2 __ Grounding bar installed on shelter/cabinet and bonded to site ground plate/ring.
3 __ Main feeder bend radius verified.
4 __ Power cable entry supports/conduits installed.
5 __ Main power cable installed and ready for connection.
6 __ Power utility meter installed and connected.
7 __ Main power supply available.
8 __ MCC & MNC frequencies assigned and confirmed.
9 __ Local electrician/power provider available.
Chassis requirements
1 __ Shelter/Cabinet anchored in position.
2 __ Foundation pad for shelter/cabinet constructed.
3 __ Backbone trunking equipment and installation material on site.
4 __ Shelter/Cabinet waterproofed.
5 __ PLMN/PSTN/E1/T1 lines installed (BER link measurements).
Table C1-1: Site Details
Site Name
IP Address
Micro BTS Name
MSC Name
Site/Access Phone
Number