UltraWAVE Micro BTS Installation and Commissioning Guide, Version B 129
Post On-Line Commissioning Procedures
5.4 Post On-Line Commissioning Procedures
1 Leave the power to the OMC and Micro BTS on.
2 Check that all E1, T1 and power cable connections between the MSC and
Micro BTS are tight.
3 Close and lock the Micro BTS door.
4 Inform the OMC operator that the Micro BTS is ready for integration testing
and connections to external BTSs.
5 Ensure that the Micro BTS site is left in a tidy state.
This concludes the commissioning of the Micro BTS. The field technician can now
leave the Micro BTS site.